分類: 行政公告
來源: 圖書資訊中心圖資服務組 - 楊麗娟 - ylj@mail.ndhu.edu.tw - 電話8632811
對象: 全校教職員_全校學生
標題: During library’s construction of the air conditioning system, we’d set up the separate reading areas equipped with independent air-conditioning for you.
日期: Mon, 29 Jun 2015 14:11:24 +0800

Dear all:
    Sorry to inform you that we have to handle the chilling water engine system during this summer vacation. Because each floor is temporarily unable to supply air conditioning during the period, we will set up a temporary reading area and a PC Room (101), both having independent air-conditioning, on the 1st floor for you. 

   You can also use the K-Center (A Building) to study. K-Center Summer Hours: Monday to Friday, am9: 30 to pm9: 30

    The construction period is estimated from July 1 (Wed) to September 1 (Tue). Once the system can be operated normally than we will announce at once.

  Sorry for the inconvenience and thankful for your understanding!

Sincerely,
Library and Information Center
National Dong Hwa University
2015.06.29

【針對此公告】   點擊數:608

 寄公告至下列信箱
      我的學校信箱 其它信箱:

 即時寄信給公告對象
      

 已批次寄出此公告,欲刪除此公告,請洽系統管理者

 


 

(只需輸入帳號,@後面不需輸入)